Construction images.

Sopwith Pup Project
Wings & Things
(continued)

Click on one to see full sized picture.

More Wing BuildingShots


Coping Center Section T/E

Adding TE Piece

Right Side done

Starting the Left

I like-a dat!

Leading Edges

Marking Struts & Wires

Lower LE 0.016"

Cut for Compression Bolt

Center Section Done.

Break Time!

LE for the Ailerons

Fini Upper Aileron well.

Readying Lower well

Making strut & cable -

Pass Throughs
   
Made Dill Guide from
drill press tube holder
Drilled a 0" hole, then
2", 3" and 4" hole.

Drilling Fabric Rivet Holes
Press fitted steel drill
bushings to finish.
From the Drawing
To the Tiedown.
Note the felted LE -
it hides the LE skin edge.
   
Done!